Deceiving

Although the room doesn’t look substantially changed, I have made some updates.

I had to have some help when I opened this up.  But my objective was to add a light over the tub; I had to do some wiring, drilling and cutting as well as climbing into the dusty attic.  This is what I had when I finished.

And it works!

Next up was the toilet.  More specifically, there was no way I could change out the floors and still leave the same flange. I talked to my friend Matt; my best bet was to cut the pipe in the garage below and add pipe which would extend above the floor level.  I can then cut it to the correct height when my floor is installed.

You can also see in the above picture the added layer of plywood.

I took out that new piece near the door and replaced it with plywood running in the same direction for added strength.

I also replaced the insulation; obviously I need more practice at this.

Although to be fair, the walls on the left have a ton of obstacles!

Next up, I will be installing the CBU, although we do not yet have the tile picked out. Alex wants some sort of blue tile, we will see…

Comments are closed.