Deceiving

Although the room doesn’t look substantially changed, I have made some updates.

I had to have some help when I opened this up.  But my objective was to add a light over the tub; I had to do some wiring, drilling and cutting as well as climbing into the dusty attic.  This is what I had when I finished.

And it works!

Next up was the toilet.  More specifically, there was no way I could change out the floors and still leave the same flange. I talked to my friend Matt; my best bet was to cut the pipe in the garage below and add pipe which would extend above the floor level.  I can then cut it to the correct height when my floor is installed.

You can also see in the above picture the added layer of plywood.

I took out that new piece near the door and replaced it with plywood running in the same direction for added strength.

I also replaced the insulation; obviously I need more practice at this.

Although to be fair, the walls on the left have a ton of obstacles!

Next up, I will be installing the CBU, although we do not yet have the tile picked out. Alex wants some sort of blue tile, we will see…

This entry was posted in Bath, Home. Bookmark the permalink.